NOTIFICATION
Temporary Water Service
Shut Off to Your Home
Thursday, June 25, 2026
4 Hours Between 7 a.m. and 6 p.m. |
¿Necesita este aviso en español? Llame al (503) 848-3000 para ayuda con traducción.
Dear Valued Customer,
On Thursday, June 25, 2026, for four hours between 7 a.m. and 5 p.m., the water service to your home will be temporarily turned off. During this time, no water will be available for use from your faucets, showers, toilets, or appliances that use water, like dishwashers and washing machines.
This shutoff will allow the contractor working for Tualatin Valley Water District (TVWD), your drinking water provider, to connect the newly installed water main to the live water system near SW Linda Lane and SW 141st Avenue.
Learn more about what to expect during the shutoff and how to prepare below.
Water Shut Off Overview
- Date: Thursday, Jun. 25
- Duration/Time: 4 hours between 7 a.m. and 6 p.m.
- Work Area: Near SW Linda Lane and SW 141st Avenue
- Addresses Affected: Shown in yellow on the map below, and include:
- 14110 SW LINDA LN
- 330 SW 141ST AVE
- 335 SW 141ST AVE
- 360 SW 141ST AVE
- 365 SW 141ST AVE
- 395 SW 141ST AVE
- 400 SW 141ST AVE
- 425 SW 141ST AVE
- 430 SW 141ST AVE
- 450 SW 141ST AVE
- 455 SW 141ST AVE
- 480 SW 141ST AVE
- 510 SW 141ST AVE
|
What to Expect
- Temporary water service shut off
- No water for use from faucets, showers, toilets, or water-using appliances
- Access to your home will be maintained, with possible short driveway delays
- Noise, dust, and vibrations during work
- Traffic control in and around the work area
- Large equipment (such as excavators) nearby
- Limited parking near the work area
- Possible impacts to bike and foot travel
- Mail, deliveries, and garbage service will continue as usual
How to Prepare
Before the Shutoff:
- Fill clean containers with 3 to 5 gallons of tap water for drinking, cooking, and flushing toilets
- Store extra water if you have a larger household or business needs
During the Shutoff:
- Keep all faucets and water-using appliances turned off
After the Shutoff:
- Turn on a faucet to check if water service has returned
- If no water comes out, turn it off, wait 15 minutes, and try again
- Once water returns, run cold water for about 2 minutes to clear your pipes
Project Information
This work is part of the Todd St. and Linda Ln. Water Main Replacement Project. The project is scheduled to be finished in July 2026, weather permitting. Permit paving of excavated areas will occur later in 2026. The schedule may change. Please visit the project webpage for the latest updates. |
Questions?
Contact TVWD Communications:
Thank you for your cooperation as we make important improvements to your neighborhood’s water system. |
Coming Soon!
The Willamette Water Supply System will provide additional water to Washington County in late-2026, so we are better prepared for current and future water challenges. Visit TVWD.org/WWSS to learn what our new water supply means for you. |
|
|
|
|
|
|