Dear Valued Customer,      

Water service to your home will be shut off for approximately 1 hour between 8 a.m. and 4 p.m. on one weekday during the week of June 29, 2026. During this time, no water will be available for use from your faucets, showers, toilets, or appliances that use water, like dishwashers and washing machines.  

This shutoff will allow Tualatin Valley Water District (TVWD), your drinking water provider, to connect your water service line to the newly installed water main under SW 184th Place. Your service line is a smaller underground pipe that connects to your water meter and brings water from the main to your home.  

Because each home will be connected one at a time to the new main, we can’t provide an exact shutoff schedule. Instead, TVWD staff will knock on your door before temporarily turning off your water for about one hour.   

Learn more about what to expect during the shutoff and how to prepare.  

Water Shut Off Overview    
  • Date: On one weekday during the week of June 29, 2026
  • Time/Duration: Between 8 a.m. and 4 p.m. for about 1-hour   
  • Work Area: Near your water meter (usually by the street)      
  • Addresses Affected: Shown in yellow on the map below, and include:  
7038 SW 184TH PL
7064 SW 184TH PL
7106 SW 184TH PL
7111 SW 184TH PL
7134 SW 184TH PL 
7137 SW 184TH PL
7166 SW 184TH PL
7171 SW 184TH PL
7190 SW 184TH PL
7193 SW 184TH PL
7218 SW 184TH PL
7221 SW 184TH PL
7240 SW 184TH PL
7245 SW 184TH PL
What to Expect    
  • Temporary water service shut off       
  • No water for use from faucets, showers, toilets, or water-using appliances   
  • Access to your home will be maintained, with possible short driveway delays   
  • Noise, dust, and vibrations during work   
  • Traffic control in and around the work area 
  • Large equipment (such as excavators) nearby 
  • Limited parking near the work area   
  • Possible impacts to bike and foot travel     
  • Mail, deliveries, and garbage service will continue as usual 
How to Prepare  
Before the Shutoff
  • Fill clean containers with 3 to 5 gallons of tap water for drinking, cooking, and flushing toilets 
  • Store extra water if you have a larger household or business needs 
During the Shutoff
  • Keep all faucets and water-using appliances turned off 
After the Shutoff
  • Turn on a faucet to check if water service has returned 
  • If no water comes out, turn it off, wait 15 minutes, and try again 
  • Once water returns, run cold water for about 2 minutes to clear your pipes 
Project Information
This work is part of the 184th Avenue Water Main Replacement Project. The project is scheduled to be finished in mid-July, weather permitting. Permit paving of excavated areas will occur later in 2026. The schedule may change. Please visit the project webpage for the latest updates.
Questions? 
Contact TVWD Communications:
Thank you for your cooperation as we make important improvements to your neighborhood’s water system.
Sign Up for Project Updates
Coming Soon!
The Willamette Water Supply System will provide additional water to Washington County in late-2026, so we are better prepared for current and future water challenges. Visit
TVWD.org/WWSS to learn what our new water supply means for you.

TVWD Communications

Tualatin Valley Water District, Beaverton, OR 97003

Unsubscribe - Unsubscribe Preferences