As part of Tualatin Valley Water District's Todd Street and Linda Lane Water Main Replacement Project, a contractor is scheduled to pave the section of SW Murray Boulevard east of SW Linda Lane where a new underground water main was recently installed and connected to the water system.
Paving Overview
- Date: Friday, July 17, 2026
- Time: 8 a.m. to 5 p.m.
- Location: SW Murray Boulevard, east of SW Linda Lane
What to Expect
Traffic
- Temporary lane shifts on SW Murray Boulevard, between SW Linda Lane and SW Rita Drive, as crews pave across the roadway.
- Traffic will remain open in both directions, but vehicles will be directed through a series of lane shifts as work progresses from SW Murray Boulevard toward SW Linda Lane.
- Traffic control devices and detour signs will be in place to guide motorists through the work area.
- Motorists should expect delays and slower travel times. Drivers are urged to reduce speed.
Detour: A temporary detour will be in place for traffic entering and exiting SW Linda Lane. Drivers will be directed to use SW Downing Street. View a detour map below.
Emergency Vehicles: Emergency vehicle access will be maintained at all times.
Bicycle Lanes: Bicycle lanes within the work zone will be temporarily closed and signed with alternate routing.
Public Transit: TriMet Bus Stop IDs 4077 and 4078 at SW Murray Boulevard and SW Linda Lane will be temporarily impacted during paving. Visit TriMet's website for updates.
Questions
Contact TVWD Communications:
TVWD appreciates the public’s patience and cooperation during this work.