RESCHEDULED
Overnight Temporary Water Service Shutoff to Your Home or Business for Water Main Abandonment

Tuesday, September 1, 2026
8 p.m. to 4 p.m.

¿Necesita este aviso en español? Llame al (503) 848-3000 para ayuda con traducción. 
Dear Valued Customer,    
 
The temporary water service shutoff originally scheduled for Monday, August 31, has been rescheduled to
overnight on Tuesday, September 1, from 8 p.m. to 4 a.m. 

During this time, no water will be available for use from your faucets, showers, toilets, or appliances that use water, like dishwashers and washing machines.

The work has been rescheduled to overnight hours to minimize disruptions to customers and reduce impacts to daytime activities.

This temporary shutoff will allow Tualatin Valley Water District (TVWD), your drinking water provider, to complete the disconnection and abandonment of the water main that previously served water to the area from the water system. 

This work is part of the Alton Street Water Main Replacement Project, which included installing more than 500 feet of new 8-inch water main under SW Alton Street. 

Please review the information below to understand what to expect and how to prepare for the overnight shutoff. We apologize for the schedule change and any inconvenience this may cause.

OVERNIGHT WATER SHUT OFF OVERVIEW
  • Date: Tuesday, Sept. 1
  • Time: 8 p.m. to 4 a.m.
  • Work Area: Near SW Alton Street and SW 185th Avenue
  • Addresses Affected by the Water Shutoff: Shown on the map below, and include:
    • 3305 SW 185th Ave.
    • 3375 SW 185th Ave.
    • 3425 SW 185th Ave.
    • 3460 SW 185th Ave.
    • 3480 SW 185th Ave.
    • 18535 SW 185th Ave.
    • 18425 SW Alexander St.
WHAT TO EXPECT  
Traffic and Access
  • Homes and businesses will remain accessible throughout the work.
  • On-street parking near the work area will be temporarily restricted.
  • Emergency vehicle access will be maintained at all times.
  • Bicycle lanes within the work zone will be temporarily closed. Signs will direct cyclists to an alternate route.
  • Expect delays and slower travel times. Please reduce your speed and watch for crews working in the area.
General Impacts
  • Construction crews and equipment in the area.
  • Nearby homes and businesses may experience temporary noise, dust, and vibration.
  • Large construction equipment will be present in the work area.
  • Mail service, deliveries, and garbage collection will continue as scheduled.
HOW TO PREPARE FOR THE SHUTOFF    
  • Before: Store enough tap water to meet your home or business's essential needs during the shutoff, including drinking water, food preparation, sanitation, and restroom use, as appropriate for your operations. 
  • During: Keep all water faucets turned off.     
  • After: Once water service has been restored, run a cold-water faucet for approximately two minutes to flush your plumbing. If water has not yet returned, turn the faucet off, wait 15 minutes, and try again. 
QUESTIONS?
Contact TVWD Communications: 
Thank you for your cooperation as we complete these important improvements to your neighborhood's water system. 
Coming Soon!
The Willamette Water Supply System will provide additional water to Washington County this winter so we are better prepared for current and future water challenges. Visit
TVWD.org/WWSS to learn what our new water supply means for you.