PAVING SCHEDULED

SW Alton Street
September 8 and 9, 2026
Each Day from 8 a.m. to 5 p.m.
¿Necesita este aviso en español? Llame al (503) 848-3000 para ayuda con traducción.  

Dear Valued Customer,

On Tuesday, September 8, and Wednesday, September 9, from 8 a.m. to 5 p.m. each day, a contractor working for Tualatin Valley Water District (TVWD), your drinking water provider, will pave portions of SW Alton Street between 18295 SW Alton Street and SW 185th Avenue.

Paving will occur only in areas where the street was excavated to install and connect the new water main. The entire street will not be repaved from curb to curb.

This paving work is the final major construction activity for TVWD’s  
Alton Street Water Main Replacement Project.

Please review the information below to learn what to expect and how to prepare.

Paving Overview

Dates and times
  • Tuesday, September 8, from 8 a.m. to 5 p.m.  
  • Wednesday, September 9, from 8 a.m. to 5 p.m.
Work Areas:
Sections of SW Alton Street where the new water main was installed.

Paving Process

Paving will include:  
  • Grinding: Crews will remove the existing pavement where the new water main was installed.
  • Paving: Hot asphalt will be placed, spread, and compacted to create a smooth, durable driving surface.
  • Sanding: A sand and asphalt seal coat will be applied to help protect the new pavement while it cures.

What to Expect During Paving 

Your water service will not be interrupted.

You should expect:
  • Temporary access delays to businesses along SW Alton Street as paving progresses through the work area.
  • Construction noise, vibration and dust.
  • No parking within the active paving area. Vehicles left in the work zone may be towed at the owner's expense.
  • Brief traffic delays and changes as crews move through the work area.
  • Flaggers and traffic control equipment. Please drive slowly and follow all traffic control signs and directions from flaggers.
  • Work schedules that may change due to weather or other conditions.
If you are sensitive to noise, consider using earplugs or a white noise machine. Keeping windows and doors closed can also help reduce noise and dust inside your business.

After Paving

  • Please avoid parking on the new asphalt for several days to allow it to harden. 
  • Some loose sand may remain on the roadway for a short time.
  • If you notice issues such as uneven pavement or poor drainage, please contact TVWD.

Paving Requirements

Washington County Land Use and Transportation (LUT) established the paving requirements for this project. 

Questions?

Contact TVWD Communications:
Learn more about the project at TVWD.org/Alton

Thank you for your patience and cooperation as we complete these important improvements to your neighborhood’s water system.  
Learn More about the Project